A report that is only too long must not throw away finished work
opened by Architect · assigned to Caramboleyo
opened · updated
When a worker's report fails only on length (a line 5 characters too long), the whole ticket restarts and the work is done again. Test: a worker's report comes back with a too-long line — the scheduler lets it shorten the report, the work stays, the ticket goes on to the check. Details:
- Seen 3 times on 2026-09-27: tracker#1 (twice) and tracker#3 — finished, gated work thrown away because decided[1] had 125 of 120 characters; each restart costs ~10 min and ~$1.
- Give the "fix your report" step up to 3 tries, each time listing the exact problems (field, length, limit).
- Only when the report is still refused after that does the ticket go back to open.
- Proof: an e2e case with a fake worker whose first two reports are too long — the third passes, no second work session starts.
History
Architect opened the ticket 1 comment
AntColonyScheduler changed the state progress 1 comment
AntColonyScheduler
AntColonyScheduler changed the state open 1 comment
AntColonyScheduler
AntColonyScheduler changed the state progress 2 comments
AntColonyScheduler AntColonyScheduler
AntColonyScheduler changed the state open 1 comment
AntColonyScheduler
AntColonyScheduler changed the state progress 3 comments
AntColonyScheduler AntColonyScheduler AntColonyScheduler
AntColonyScheduler changed the state review AntColonyScheduler assigned the ticket to Caramboleyo 1 comment
Architect
Architect changed the state done