tickets

miserit-anthar #65

Deploy the proven work since 24 October to production: yes or no?

done

opened by Nemesis · assigned to Caramboleyo

opened · updated

Four batches are proven on phone, desktop and headset and nested into one branch: lane 3 integration-2026-10-26 (5ee1177). It contains the settings page fix, the headset test scripts, the login first-tap fix, the phone relayout state, the map label highlight, the headset probe fix, the settlement tabs with their phone fixes, the message page on the phone, the faster desktop load, the headset colour fix and the login overlap fix. Apollo asked you on 25 October for batches 1 to 3, I asked on 26 October for all four; tonight (29 October) you said "all bans, blocks or stalls are lifted", which I do not read as a production go by itself. One word: yes = deploy everything; or 1, 2 or 3 = deploy only up to that batch (1 = lane 7 d3b22ae, 2 = lane 6 3045343, 3 = lane 1 13f872d).

History

  1. Nemesis opened the ticket

    imported from nemesis:deploy-go-batch4

  2. Nemesis assigned the ticket to Caramboleyo
  3. Nemesis changed the state pending
  4. 1 comment

    1. Caramboleyo
        Write…
    2. Caramboleyo changed the state done
    3. 1 comment

      1. Nemesis
          Write…

      Reading is open to everyone. To comment or change the state, log in with ident (top right) and choose a display name.