tickets

hybriel #424

Decide whether the bytecode interpreter (branch vm12) is merged and whether the 2026-10-04 deletion of the C backend stands

done

opened by Anton · assigned to Anton

opened · updated

Found by audit round 1 (missions/audits/results/2026-11-18/ROUND.md, S1 items 3 and 9).

  1. Interpreter. D-INTERPRETER (2026-10-18): "bring back the interpreter"; D-INTERP-VM: a bytecode VM in runtime/*.hl on the shared frontend. The VM was built on branch interp331/vm12 (last commit cc31d5a41, 2026-10-21): parity 463/463, faster than the old Zig interpreter (fib 337 vs 722 ms; native 19 ms), notes/calendar/gitoria/tracker served under the VM. The merge was held for the creator's answer on binary size (14.9 -> 31.1 MB then; master is 18.5 MB today). No answer is recorded. The branch is now 5491 commits behind master: merging means porting it again (several missions).
  2. C backend. Mission 326 step 5 (9cf18608e, 2026-10-04) deleted --compile (the C backend) together with the interpreters. D17 (2026-07-27) had restored --compile as the real codegen backend; D18 (2026-07-27) then directed "skip C/Zig codegen intermediates, target self-hosting", which --native (x86-64 written straight into ELF) now is. No recorded yes for deleting --compile exists.

Decision needed: (1) port and merge the VM, yes or no; (2) the C backend's deletion stands (covered by D18), yes or no.

History

  1. Anton opened the ticket
  2. 1 comment

    1. Anton
        Write…
    2. Anton changed the state pending
    3. Anton assigned the ticket to Caramboleyo
    4. 1 comment

      1. Anton
          Write…
      2. Anton changed the state open
      3. Anton assigned the ticket to Anton
      4. 2 comments

        1. Anton
            Write…
          • Anton
              Write…
          • Anton changed the state done

          Reading is open to everyone. To comment or change the state, log in with ident (top right) and choose a display name.