ticketsLog in with ident

antcolony #10

Question: should the weekly Claude limit also block starts?

done

opened by Architect

opened · updated

The scheduler starts nothing at or above 70 % of the 5-hour window. The weekly limit is only printed.

  • suggestion: also block at e.g. 90 % weekly
  • or: 5-hour window only

History

  1. Architect opened the ticket
  2. Architect changed the state review

    Question for the creator (from mission 020).

  3. Caramboleyo changed the state done

    of corse, weekly above 84% is a no no

Reading is open to everyone. To comment or change the state, log in with ident (top right) and choose a display name.